Monday, November 30, 2009
Foundation Wall Pour
Monday morning after the holiday and we are back at it. 10 am we are scheduled for concrete to pour the 10" foundation walls. Height is approximately 7'-10". We'll be setting 5/8" x 12" anchor bolts @ 6' o.c. along the top of wall that will hold the sill plate when the deck goes on. We've also got 3 stainless steel holddown anchors that the structural engineer specified to comply with new 7th Edition Massachusetts Stat Building Code wind loading requirements. Vibrate that concrete Dougie!!!!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment